Infrastructure’s Economic Evaluation
- Probabilistic life-cycle cost analysis of infrastructures. e.g. tunnels, bridges, etc.
- Integrated system of cost-benefit analysis of infrastructure projects
- Dynamic predictive system for bridges’ life-cycle “service value”
- Integrated system for fast, early estimation of road work quantities, duration and cost
Operation Analysis, Construction Equipment Management and Economics
- Dynamic planning of construction sites for linear projects
- Machine learning application for construction equipment productivity optimization
- Application of multi-criteria analysis (MCDA) methods for hierarchizing the construction equipment’s procurement criteria
- Application of MCDA methods for hierarchizing the construction equipment operator’s performance factors for optimizing the equipment’s productivity
- Construction equipment economic life optimization by tracking their operating and maintenance time-patterns (history)
- Machine learning applications for predicting construction equipment economic indicators (eg. residual value)
- Conceptual model development for applying a comprehensive prescriptive maintenance model, as an evolution of the predictive maintenance model
Management of Infrastructure Projects
- Infrastructure and Large Project Procurement
- Management of Public Contracts
- Exploring the mechanisms for Value-for Money diffusion in the Design and Procurement of Infrastructure Projects
- Resilience Engineering
- Management of Construction Companies
- Management of Information Systems in Civil Engineering Projects